2,042,423Injury reports 130,778Establishments Most recent incident 2025-12-31
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Injury Report: Galindo & Boyd Wall Systems

Injury · Days away from work

On , an injury at Galindo & Boyd Wall Systems in 4625 Eastover Dr, Mesquite, TX 75149 resulted in days away from work. Employee was mason in retaining wall, masonry (i.e., block, brick, stone), construction.

Parent company
Galindo & Boyd Wall Systems
Street
4625 Eastover Dr
City
Mesquite
State
TX
ZIP
75149
On-site location
Ground level near lockers
Outcome
Days away from work (code 2)
Type
Injury (code 1)
Days away from work
27
Days restricted or transferred
99

Cleaning the brick near the pool area

While working the wind blew an electrical panel over that was placed against the wall. The panel struck the employee and cause the employee to fall to the ground.

Acute head injury, neck sprain and contusion of the left shoulder.

a 6 ft electrical panel

employee was struck by an 8ft electrical box that was propped along the wall he was working on. The box struck him on his back and head causing a left shoulder contusion neck and shoulder sprain

Job description
Mason
SOC code
9999 — Uncoded
NAICS code
238140 — Retaining wall, masonry (i.e., block, brick, stone), construction
NAICS vintage
2022
Avg employees
715
Total hours worked
1258988
EIN
453794796
Establishment ID
1251497
Employer case #
201
Date of incident
Shift started
7:00:00.000
Submitted
10DEC24:16:48:00

View Galindo & Boyd Wall Systems's full OSHA safety record →

WM 4464

WM 4194

WM 3005

WM 2977

WM 1803

Data from OSHA ITA Form 300/301 electronic submissions, filing year unspecified. ITA Case Detail records are establishment-reported submissions, not OSHA inspections — no per-record IMIS deep link exists.