PATERSON, NJ —
OSHA Inspection: DAICOLOR-POPE CHEMICAL COMPANY
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of DAICOLOR-POPE CHEMICAL COMPANY in 33 6TH AVENUE, PATERSON, NJ 07514 (NAICS 000000). OSHA activity number 101154227.
Where did this inspection happen?
- Establishment
- DAICOLOR-POPE CHEMICAL COMPANY
- Site address
- 33 6TH AVENUE
- City
- PATERSON
- State
- NJ
- ZIP
- 07514
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2865
- Employees
- 100
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
75 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
General-duty citation text
SECTION 5(A)(1) OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970: THE EMPLOYER DID NOT FURNISH EMPLOYMENT AND A PLACE OF EMPLOYMENT WHICH WERE FREE FROM RECOGNIZED HAZARDS THAT WERE CAUSING OR LIKELY TO CAUSE DEATH OR SERIOUS PHYSICAL HARM TO EMPLOYEES IN THAT EMPLOYEES WERE EXPOSED TO THE HAZARD OF BUILDING/STRUCTURE FAILURE WHEN WORKING ON OR UNDER THE MEZZANINE/2ND FLOOR OF MAIN PLANT DUE TO SETTLEMENT OF THE 1ST FLOOR SLAB AND DAMAGE TO SUPPORT COLUMNS OF MAZZANINE/2ND FLOOR: AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS TO FOLLOW RECOMMENDATIONS OF STRUCTURAL ENGINEER IN 11/15/90 REPORT: 1)EMPTY AND CEASE USE OF TANKS ON THE 2ND FLOOR/MEZZANINE. 2) PROVIDE SUFFICIENT CLEARANCE BETWEEN COLUMNS AND ANY PASSING MOVEMENT. 3) PROVIDE A STUDY OF 2ND FLOOR/MEZZANINE NEEDS TO REDUCE LOAD AND REPAIR STRUCTURE. 4) DISCONTINUE USE OF 2ND FLOOR/MEZZANINE.
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.23 A03
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $500.00 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $900.00
1910.23 D01 IV
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.24 H
- Issued
- Abate by
1910.26 C02
- Issued
- Abate by
- Penalty
- Initial $500.00 · Current $500.00
1910.27 F
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.36 B04
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $900.00
1910.36 B06
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.36 D02
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
1910.37 H01
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $900.00
1910.38 A01
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.38 B02
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.106 D05 I
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
1910.106 E09 III
- Issued
- Abate by
- Penalty
- Initial $700.00
Recent events (2)
- — I (O)
- — Z (S) $700.00
1910.110 E04 III
- Issued
- Abate by
- Penalty
- Initial $700.00 · Current $700.00
1910.120 Q02
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
1910.120 Q06
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
1910.120 Q11 II
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.147 C01
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.147 C05 I
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.147 C07 IV
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $900.00
Recent events (2)
- — I (S) $900.00
- — Z (S) $900.00
1910.156 B01
- Issued
- Abate by
- Penalty
- Initial $1000.00
Recent events (2)
- — I (S)
- — Z (S) $1000.00
1910.156 B02
- Issued
- Abate by
- Penalty
- Initial $1000.00
Recent events (2)
- — I (O)
- — Z (S) $1000.00
1910.157 C01
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $500.00 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $1000.00
1910.160 B04
- Issued
- Abate by
- Penalty
- Initial $700.00 · Current $700.00
Recent events (2)
- — I (S) $700.00
- — Z (S) $700.00
1910.160 B05
- Issued
- Abate by
Recent events (2)
- — I (S)
- — Z (S)
1910.160 B17
- Issued
- Abate by
- Penalty
- Initial $700.00 · Current $700.00
1910.162 B03
- Issued
- Abate by
- Penalty
- Initial $700.00 · Current $700.00
Recent events (2)
- — I (S) $700.00
- — Z (S) $700.00
1910.162 B05
- Issued
- Abate by
- Penalty
- Initial $700.00 · Current $400.00 Reduced
Recent events (3)
- — P (S) $400.00
- — I (S) $400.00
- — Z (S) $700.00
1910.178 M11
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.178 O01
- Issued
- Abate by
- Penalty
- Initial $400.00 · Current $400.00
1910.212 A01
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.212 A02 II
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $900.00
1910.215 A04
- Issued
- Abate by
- Penalty
- Initial $400.00 · Current $400.00
1910.215 B09
- Issued
- Abate by
- Penalty
- Initial $400.00 · Current $400.00
1910.219 B01
- Issued
- Abate by
- Penalty
- Initial $500.00 · Current $300.00 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $500.00
1910.252 A02 II
- Issued
- Abate by
- Penalty
- Initial $600.00 · Current $600.00
1910.252 A02 IIIA
- Issued
- Abate by
- Penalty
- Initial $600.00 · Current $600.00
1910.253 A04
- Issued
- Abate by
- Penalty
- Initial $600.00 · Current $600.00
1910.253 B05 III
- Issued
- Abate by
- Penalty
- Initial $600.00 · Current $600.00
1910.254 D08
- Issued
- Abate by
- Penalty
- Initial $600.00 · Current $600.00
1910.254 D09 III
- Issued
- Abate by
- Penalty
- Initial $600.00 · Current $600.00
1910.303 B01
- Issued
- Abate by
- Penalty
- Initial $800.00
Recent events (2)
- — I (S)
- — Z (S) $800.00
1910.303 E
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $300.00 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $800.00
1910.303 F
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.304 F04
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $900.00
1910.305 A01 I
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.305 A02 IIIG
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $400.00 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $800.00
1910.305 B01
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.305 B02
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.305 G01 III
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.305 J02 II
- Issued
- Abate by
- Penalty
- Initial $800.00 · Current $800.00
1910.307 B
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $900.00
1910.1200 E01 I
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.1200 E02 II
- Issued
- Abate by
- Penalty
- Initial $1000.00 · Current $1000.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $7000.00
General-duty citation text
SECTION 5(A)(1) OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970: THE EMPLOYER DID NOT FURNISH EMPLOYMENT AND A PLACE OF EMPLOYMENT WHICH WERE FREE FROM RECOGNIZED HAZARDS THAT WERE CAUSING OR LIKELY TO CAUSE DEATH OR SERIOUS PHYSICAL HARM TO EMPLOYEES IN THAT EMPLOYEES WERE EXPOSED TO THE HAZARD OF BEING STRUCK BY PLATFORM AND/OR FALLING IN SHAFTWAY WHEN OPERATING AND WORKING AROUND UNGUARDED SHAFTS OF MATERIAL LIFTS/ ELEVATORS: A) AZO DEPARTMENT: LIFT FROM 1ST FLOOR TO MEZZANINE WAS NOT GUARDED ON OR ABOUT 9/13/90. B) SHADY STREET, 1ST FLOOR: GATE AROUND LIFT WAS NOT CLOSED ON OR ABOUT 9/13/90. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS TO: INSTALL THE FENCE THAT WAS ORIGINALLY AROUND THE AZO DEPARTMENT LIFT AND INTERLOCK THE ENTRANCE GATES TO PREVENT THE DOOR FROM OPENING UNLESS THE PLATFORM IS AT THE LANDING. REPAIR 1ST FLOOR GATE OF SHADY STREET LIFT SO THAT IT CLOSES AND INTERLOCKS.
1910.22 C
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $7000.00
1910.23 A03
- Issued
- Abate by
- Penalty
- Initial $8000.00 · Current $8000.00
1910.23 B01
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $7000.00
1910.23 C01
- Issued
- Abate by
- Penalty
- Initial $10000.00 · Current $10000.00
1910.36 B04
- Issued
- Abate by
- Penalty
- Initial $10000.00 · Current $10000.00
1910.157 G02
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $5000.00
1910.176 A
- Issued
- Abate by
- Penalty
- Initial $6000.00 · Current $6000.00
1910.176 B
- Issued
- Abate by
- Penalty
- Initial $6000.00 · Current $6000.00
1910.178 L
- Issued
- Abate by
- Penalty
- Initial $6000.00 · Current $6000.00
1910.178 Q07
- Issued
- Abate by
- Penalty
- Initial $6000.00 · Current $6000.00
1910.212 A01
- Issued
- Abate by
- Penalty
- Initial $9000.00 · Current $9000.00
1910.303 G02 I
- Issued
- Abate by
- Penalty
- Initial $9000.00 · Current $9000.00
1910.1200 F01 II
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $5000.00
1910.1200 F05 I
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $7000.00
1910.1200 F05 II
- Issued
- Abate by
1910.1200 H
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $7000.00
1910.1200 H02 I
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $7000.00
1910.178 A05
- Issued
- Abate by
1910.178 A06
- Issued
- Abate by
More inspections at DAICOLOR-POPE CHEMICAL COMPANY
PATERSON, NJ—1991-06-20 00:00:00
DAICOLOR-POPE CHEMICAL COMPANY
PATERSON, NJ—1991-06-18 00:00:00
DAICOLOR-POPE CHEMICAL COMPANY
PATERSON, NJ—1990-08-02 00:00:00
DAICOLOR-POPE CHEMICAL COMPANY
View DAICOLOR-POPE CHEMICAL COMPANY's full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in NJ
PERTH AMBOY, NJ—2026-07-16 00:00:00
ENGLERT INC.
RIDGEFIELD, NJ—2026-07-16 00:00:00
COLORITE PLASTICS COMPANY
BERLIN, NJ—2026-07-16 00:00:00
URUS CONSTRUCTION CORPORATION
GLASSBORO, NJ—2026-07-15 00:00:00
GLASSBORO WATER & SEWER DEPARTMENT
FLANDERS, NJ—2026-07-15 00:00:00
TRI-STATE QUIKRETE
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101154227.