MT. VERNON, IL —
OSHA Inspection: DOWZER ELECTRIC CO.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of DOWZER ELECTRIC CO. in 1ST & CASTLETON, MT. VERNON, IL 62864 (NAICS 000000). OSHA activity number 102582368.
Where did this inspection happen?
- Establishment
- DOWZER ELECTRIC CO.
- Site address
- 1ST & CASTLETON
- City
- MT. VERNON
- State
- IL
- ZIP
- 62864
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3612
- Employees
- 5
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $420.00 · Current $210.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: ...the hazard of fires, resulting in severe burns, asphyxiation, and/ or death to employees, while water was being removed from transformer oils by evaporation in open top vessels heated by gas-fired furnaces. No methods were employed to monitor water level of and/or heat input to the oil/water mixture, resulting in ignition of the oil after all the water had evaporated. Among other methods, one feasible and acceptable method to correct this hazard is to use chemical or mechanical reconditioning and/or reclamation processes for removal or water from transformer oils, such as those stipulated in Section 6 of IEEE Standard 637-1985. IEEE Guide For the Reclamation of Insulation Oil and Criteria for Its Use. Such processes include the following: 1) Vacuum dehydration 2) Centrifuge 3) Coalescing filters 4) Precipation settling 5) Perculation by pressure DISCLAIMERS: 1) You are not limited to the abatement methods suggested above. 2) The methods explained are general and may not be effective in all cases. 3) The employer is responsible for selecting and carrying out an appropriate abatement method.
Recent events (2)
- — F (S) $210.00
- — Z (S) $420.00
More inspections at DOWZER ELECTRIC CO.
PELL CITY, AL—1984-08-06 00:00:00
DOWZER ELECTRIC CO
Mt Vernon, IL—1984-01-12 00:00:00
DOWZER ELECTRIC CO
Mt Vernon, IL—1984-01-12 00:00:00
DOWZER ELECTRIC CO
Mt Vernon, IL—1983-09-21 00:00:00
DOWZER ELECTRIC CO
View DOWZER ELECTRIC CO.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102582368.