Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: BIG BASIN ELECTRIC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of BIG BASIN ELECTRIC in QUAIL CREEK WATER TREATMENT PLANT, HURRICANE, UT 84737 (NAICS 000000). OSHA activity number 105596191.

Watch BIG Basin Electric — free Get an email when a new federal OSHA severe-injury report for BIG Basin Electric is published. One employer, no account, unsubscribe in one click.
Establishment
BIG BASIN ELECTRIC
Site address
QUAIL CREEK WATER TREATMENT PLANT
City
HURRICANE
State
UT
ZIP
84737
Mailing
P.O. BOX 1255, ST. GEORGE, UT 84770
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1731
Employees
7
Ownership type
A
Industry flags
Construction health.

2 citations on file for this inspection.

CON0403090200001

Other-than-serious 1 instance 5 exposed
Issued
Abate by

CON0403090200003

Other-than-serious 1 instance 5 exposed
Issued
Abate by

KGC, INC.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 105596191.