PELL CITY, AL —
OSHA Inspection: BENJAMIN MOORE & COMPANY
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of BENJAMIN MOORE & COMPANY in 109 BAMBERG DRIVE, PELL CITY, AL 35125 (NAICS 325510). OSHA activity number 314425984.
Where did this inspection happen?
- Establishment
- BENJAMIN MOORE & COMPANY
- Site address
- 109 BAMBERG DRIVE
- City
- PELL CITY
- State
- AL
- ZIP
- 35125
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325510
- SIC code (legacy)
- 2851
- Employees
- 129
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
5 citations on file for this inspection.
1910.119 F04
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
General-duty citation text
29 CFR 1910.119(f)(4): The employer did not develop and implement safe work practices for employees and contractor employees to provide for the control of hazards during operations such as lockout/tagout; confined space entry; opening process equipment or piping; and control over entrance into a facility by maintenance, contractor, laboratory, or other support personnel: (a) On or about July 17, 2010 - Resin Plant, the employer did not ensure that contractor employees engaged in changing stainless steel pipes and flanges followed safe work practices addressing hazards such as, but not limited to, lockout/tagout of equipment; hot work permits; the opening of process equipment or piping; confined space entry; and control over entrance into a facility by maintenance, contractor, laboratory, or other support personnel.
Recent events (2)
- — I (S) $4000.00
- — Z (S) $5000.00
1910.120 Q02 II
- Issued
- Abate by
- Penalty
- Initial $2500.00
General-duty citation text
29 CFR 1910.120(q)(2)(ii): The emergency response plan did not address, to the extent not addressed elsewhere, the personnel roles, lines of authority, and communication: (a) On or about June 17, 2010 - Facility, the written emergency response plan for chemical releases and spills did not describe personnel roles.
Recent events (2)
- — I (O)
- — Z (S) $2500.00
1910.120 Q02 VII
- Issued
- Abate by
General-duty citation text
29 CFR 1910.120(q)(2)(vii): The emergency response plan did not address, to the extent not addressed elsewhere, the decontamination: (a) On or about June 17, 2010 - Facility, the written emergency response plan for chemical releases and spills did not address the decontamination procedures.tion
Recent events (2)
- — I (S)
- — Z (S)
1910.120 Q02 VIII
- Issued
- Abate by
General-duty citation text
29 CFR 1910.120(q)(2)(viii): The emergency response plan did not address, to the extent not addressed elsewhere, the emergency medical treatment and first aid: (a) On or about June 17, 2010 - Facility, the written emergency response plan for chemical releases and spills did not include information about medical treatment and first aid.t
Recent events (2)
- — I (S)
- — Z (S)
1910.120 Q06 III
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.120(q)(6)(iii): Employees who participated or were expected to participate, as hazardous material technicians had not received at least 24 hours of training equal to the first responder operations level and/or had not been certified as having such training and/or in addition did not have competency to know how to implement the employer's emergency response plan: (a) On or about June 17, 2010 - Facility, employees who were expected to stop chemical releases by closing valves or shutting down processes and equipment had not been provided 24 hours of training as hazardous materials technicians.
Recent events (2)
- — I (O) $1000.00
- — Z (S) $2500.00
More inspections at BENJAMIN MOORE & COMPANY
ST LOUIS, MO—1985-08-15
BENJAMIN MOORE & COMPANY
View BENJAMIN MOORE & COMPANY's full OSHA safety record →
More inspections in this industry (NAICS 325510)
HEALDSBURG, CA—2026-07-08
RUPERT GIBBON & SPIDER, INC.
ROCKLEDGE, FL—2026-06-24
RICHARD'S PAINT MANUFACTURING CO
ROCHESTER, PA—2026-06-18
THE SHERWIN-WILLIAMS COMPANY
AUBURN, CA—2026-06-15
PRESERVA PRODUCTS LTD
FAIRLESS HILLS, PA—2026-06-09
SUDARSHAN FAIRLESS HILLS MANUFACTURING
More inspections in AL
CLANTON, AL—2026-07-13
UBIQUE TECHNOLOGIES, INC.
IRONDALE, AL—2026-07-13
FATHER NATURE LANDSCAPES OF BIRMINGHAM, INC.
GARDENDALE, AL—2026-07-09
ANDINO'S IRON WORKERS, LLC
CULLMAN, AL—2026-07-09
ALFREDO PICHARDO BLANCO
MOBILE, AL—2026-07-09
FLEXICREW TECHNICAL, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314425984.