SAIPAN, MP —
OSHA Inspection: BIG BELL, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BIG BELL, INC. in SANDY BEACH HOMES SAN ISIDRO AVENUE, CHALAN KANAOA, SAIPAN, MP 96950 (NAICS 236116). OSHA activity number 331081117.
Where did this inspection happen?
- Establishment
- BIG BELL, INC.
- Site address
- SANDY BEACH HOMES SAN ISIDRO AVENUE, CHALAN KANAOA
- City
- SAIPAN
- State
- MP
- ZIP
- 96950
- Mailing
- P.O. BOX 5423 CHRB, SAIPAN, MP 96950
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- Employees
- 20
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $2400.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports: At the south end of the building, the working platform on a pole scaffold was not fully planked, exposing employees to the hazard of falling from a height of about 54 feet from the 8th level scaffold platform to the ground.
Recent events (2)
- — I (S) $1200
- — Z (S) $2400
1926.452 B02
- Issued
- Abate by
- Penalty
- Initial $2400.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1926.452(b)(2): Transverse bracing forming an "X" across the width of the scaffold was not installed at the scaffold ends and at least at every third set of posts horizontally (measured from only one end) and every fourth runner vertically. Bracing did not extend diagonally from the inner or outer posts or runners upward to the next outer or inner posts or runners: At the south end of the building, the tube and coupler scaffold was missing cross bracing along the width of the scaffold and cross bracing was not installed at the scaffold ends. This condition may potentially result in overall scaffold instability thereby exposing employees to struck-by hazards from the scaffold or falls from scaffold failure.
Recent events (2)
- — I (S) $1200
- — Z (S) $2400
More inspections at BIG BELL, INC.
SAIPAN, MP—2022-10-19 00:00:00
BIG BELL, INC.
SAIPAN, MP—2021-10-27 00:00:00
BIG BELL, INC.
SAIPAN, MP—2021-06-23 00:00:00
BIG BELL, INC.
SAIPAN, MP—2019-07-25 00:00:00
BIG BELL, INC.
SAIPAN, MP—2019-01-31 00:00:00
BIG BELL, INC.
View BIG BELL, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236116)
DELAVAN, WI—2026-07-15
TERONOMY BUILDERS, INC.
QUINCY, MA—2026-07-15
UNITEDWOR VM CONTRACTOR CORP
NEWTON, MA—2026-07-14
DELLBROOK CONSTRUCTION, LLC
NEWTON, MA—2026-07-14
GARDEN HOMES
PLAIN CITY, OH—2026-07-09
RUSCILLI CONSTRUCTION
More inspections in MP
SAIPAN, MP—2025-05-15
PARAGON CORP.
SAIPAN, MP—2025-05-14
WINZY CORPORATION
SAIPAN, MP—2025-05-14
HONG YE RENTAL & CONSTRUCTION, LTD.
SAIPAN, MP—2025-05-14
GU LI QIANG
SAIPAN, MP—2025-05-14
GENESIS ENTERPRISES, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331081117.