OSHA Inspection: HONG YE CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HONG YE CONSTRUCTION in NEW TWO BEDROOM RESIDENCE FOR CHRYSTAL GUERRERO AND AUGUSTINE CASTRO PROJECT TALOFOFO ROAD, VILLAGE OF I'DENNI, SAIPAN, MP 96950 (NAICS 236115). OSHA activity number 336016621.

Watch Hong YE Construction — free Get an email when a new federal OSHA severe-injury report for Hong YE Construction is published. One employer, no account, unsubscribe in one click.
Site address
NEW TWO BEDROOM RESIDENCE FOR CHRYSTAL GUERRERO AND AUGUSTINE CASTRO PROJECT TALOFOFO ROAD, VILLAGE OF I'DENNI
City
SAIPAN
State
MP
ZIP
96950
Mailing
PO BOX 502997 CHALAN KANOA, SAIPAN, MP 96950
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236115
Employees
11
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(b)(1):  Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports:      At the project, on or about August 29, 2012, and at times prior thereto, the platform was not fully planked.  Employees on the scaffold platform poured five gallon buckets of water into newly installed PVC pipes to test for leaks.  The scaffold platform was about seven feet above the sand.
Recent events (1)
  • — Z (O) $0

1926.452 A03

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(a)(3): Diagonal bracing in both directions was not installed across the entire inside face of double-pole scaffolds used to support loads equivalent to a uniformly distributed load of 50 pounds (222 kg) or more per square foot (929 square cm):    At the project, on or about August 29, 2012, and at times prior thereto, there was no diagonal bracing on a double pole wood scaffold.  Employees on the scaffold platform poured five gallon buckets of water into newly installed PVC pipes to test for leaks.  The scaffold platform was about seven feet above the sand.
Recent events (1)
  • — Z (O) $0

1926.452 A04

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(a)(4): Diagonal bracing in both directions was not installed across the entire outside face of all double- and single-pole scaffolds:     At the project, on or about August 29, 2012, and at times prior thereto, there was no diagonal bracing on a double pole wood scaffold.  Employees on the scaffold platform poured five gallon buckets of water into newly installed PVC pipes to test for leaks.  The scaffold platform was about seven feet above the sand.
Recent events (1)
  • — Z (O) $0

1926.452 A07

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(a)(7): Runners were not supported by bearing blocks securely attached to the poles:    At the project, on or about August 29, 2012, and at times prior thereto, there were no bearer blocks for the runners on a double pole wood scaffold.  Employees on the scaffold platform poured five gallon buckets of water into newly installed PVC pipes to test for leaks.  The scaffold platform was about seven feet above the sand.
Recent events (1)
  • — Z (O) $0

1926.451 E06 VI

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(e)(6)(vi):  Have a maximum spacing between rungs of 16 3/4 inches (43 cm). Non-uniform rung spacing caused by joining end frames together is allowed, provided the resulting spacing does not exceed 16 3/4 inches (43 cm):    At the project, on or about August 29, 2012, and at times prior thereto, the spacing between the integral rungs was 21 inches.  Employees on the scaffold platform poured five gallon buckets of water into newly installed PVC pipes to test for leaks.  The scaffold platform was about seven feet above the sand.
Recent events (1)
  • — Z (O) $0

View HONG YE CONSTRUCTION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336016621.