OSHA Inspection: AMERICAN DRILLING AND PROTOYPING INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of AMERICAN DRILLING AND PROTOYPING INC. in 625 GLENN AVENUE, WHEELING, IL 60090 (NAICS 332710). OSHA activity number 337479810.

Watch American Drilling AND Protoyping INC. — free Get an email when a new federal OSHA severe-injury report for American Drilling AND Protoyping INC. is published. One employer, no account, unsubscribe in one click.
Site address
625 GLENN AVENUE
City
WHEELING
State
IL
ZIP
60090
Mailing
625 GLENN AVENUE, WHEELING, IL 60090
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332710
Employees
45
Ownership type
A

6 citations on file for this inspection.

1910.110 F02 I

Serious Gravity 1 1 instance 2 exposed
Issued
Penalty
Initial $1517.00 · Current $880.00 Reduced
29 CFR 1910.110(f)(2)(i): LP-Gas Containers shall not be stored in a manner that exposes the containers to excessive temperature rise, physical damange, or tampering by unauthorized persons.    (a) Shop area (northside wall) - LP-Gas Containers were stored in a manner that exposed the containers to physical damange and tampering by unauthorized persons.      No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $880
  • — Z (S) $1517

1910.147 C01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2975.00 · Current $1720.00 Reduced
29 CFR 1910.147(c)(1): The employer shall establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative:    (a) Facility Wide - The employer failed to establish a lockout tagout program that included an energy control procedure for employees to follow, training and periodic inspections to protect employees performing set up and maintenance from injury caused by unexpected start up and energy releases.  Employees were exposed to injury while servicing motors and performing "set up" work on equipment including, but not limited to, the Nardini - ND 1560E Lathe, and drill and tap machines with electrical and pnuematic energy sources that were not isolated or controlled.    In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1720
  • — Z (S) $2975

1910.212 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2380.00 · Current $1380.00 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    (a) Shop area - One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area of the Nardini - ND 1569 E lathe from hazards such as those created by ingoing nip points, and the rotating chuck.     (b) Shop area - One or more methods of machine guarding was not provided to protect the operator and other employees in the area from the unused portion of the rotating blade on the Rollin vertical band saw.     In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1380
  • — Z (S) $2380

1910.219 D01

Serious Gravity 5 2 instances 2 exposed
Issued
Penalty
Initial $2529.00 · Current $1470.00 Reduced
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):    (a) Shop Area (drill and tap machine with box 63) - Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded.   (b) Shop Area (drill and tap machine with box 64) - Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded.       No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $1470
  • — Z (S) $2529

1910.219 E03 I

Serious Gravity 5 2 instances 2 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.219(e)(3)(i): Vertical and inclined belts shall be enclosed by a guard conforming to standards in paragraphs (m) and (o) of this section.      (a) Shop Area (drill and tap machine with box 63) - Vertical and inclined belts seven feet or less from the floor or work platform were not enclosed by a guard.     (b) Shop Area (drill and tap machine with box 64) - Vertical and inclined belts seven feet or less from the floor or work platform were not enclosed by a guard.     No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 G01 II

Serious Gravity 1 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $1785.00 · Current $1030.00 Reduced
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage:    (a) Shop Area (northside wall) - The required working space about electric equipment such as but not limited to the three 120/208 volt panels and the one 480 volt panel, rated 600 volts, nominal, or less to ground, was used for storage of a desk, boxes, and a step ladder.     (b) Shop Area (southside wall) - The required working space about electric equipment such as but not limited to the three 240 volt panels and the one 120/208 volt panel, rated 600 volts, nominal, or less to ground, was used for storage of a radio and speakers, wooden stools, and other various items.         In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1030
  • — Z (S) $1785