1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: RICHARDS & WEYER CONSTRUCTION CO. INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RICHARDS & WEYER CONSTRUCTION CO. INC. in 5400 N. NORTHWEST HWY., CHICAGO, IL 60630 (NAICS 238140). OSHA activity number 338998164.

Watch Richards & Weyer Construction CO. INC. — free Get an email when a new federal OSHA severe-injury report for Richards & Weyer Construction CO. INC. is published. One employer, no account, unsubscribe in one click.
Site address
5400 N. NORTHWEST HWY.
City
CHICAGO
State
IL
ZIP
60630
Mailing
8443 W. 44TH PL., LYONS, IL 60534
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
30
Ownership type
A

2 citations on file for this inspection.

1926.602 C01 II

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $1900.00 Reduced
29 CFR 1926.602(c)(1)(ii): Modifications or additions affecting the safe operation of the equipment were  made without the manufacturer's written approval: Note:  If such modifications or changes were made, the capacity, operation, and maintenance instruction plates, tags, or decals should have been changed accordingly.      a) Employees were using Lull 844C-42 all terrain forklift to hoist and transport Baldor Generators TS35 suspended from the forks by the use of wire rope slings.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1900
  • — Z (S) $3500

1926.251 A02 I

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.251(a)(2)(i): The employer did not ensure that rigging equipment had permanently affixed and legible identification markings as prescribed by the manufacturer that indicate the recommended safe working load:   a)  The employer did not ensure that the wire rope sling available for employee use at the site had permanently affixed and legible identification markings as prescribed by the manufacturer that indicate the recommended safe working load.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View RICHARDS & WEYER CONSTRUCTION CO. INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338998164.