OSHA Inspection: DONALDSON INTERIORS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DONALDSON INTERIORS, INC. in ENGINEERING DR, STONY BROOK, NY 11794 (NAICS 236220). OSHA activity number 339642019.

Watch Donaldson Interiors, INC. — free Get an email when a new federal OSHA severe-injury report for Donaldson Interiors, INC. is published. One employer, no account, unsubscribe in one click.
Site address
ENGINEERING DR
City
STONY BROOK
State
NY
ZIP
11794
Mailing
150 WIRELESS BLVD., HAUPPAUGE, NY 11788
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
20
Ownership type
A

7 citations on file for this inspection.

1926.25 A

Other-than-serious 2 instances 20 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures:    a) Worksite, Interior, 3rd Flr - Material such as, but not limited to, sheetrock, metal studs, insulation, paper, tape and cardboard, was left on the floor of the atrium where employees were engaged in work activity; on, or about, 03/20/2014.    b) Worksite, Interior, 2rd Flr - Material such as, but not limited to, sheetrock, metal studs, insulation, paper, tape and cardboard, was left on the floor of the atrium where employees were engaged in work activity; on, or about, 03/20/2014.          Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $2800
  • — Z (S) $2800

1926.502 B01

Other-than-serious 1 instance 20 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.502(b)(1): The top edge height of the top rails, or equivalent guardrail system members, was not 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level:    a) Worksite, Interior; 3rd Flr, Southern Atrium Opening - Wire rope, used for top rails, hung between posts at a heights of approximately 37.25 inches to 38.5 inches; on, or about, 03/20/2014.           Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $2800
  • — Z (S) $2800

1926.502 B04

Other-than-serious 1 instance 20 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.502(b)(4): When the 200 pound (890 N) test load specified in paragraph (b)(3) of this section was applied in a downward direction, the top edge of the guardrail deflected to a height less than 39 inches (1.0 m) above the walking/working level:     a) Worksite, Interior; 3rd Flr, Southern Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 31.5 inches; on, or about, 03/20/2014.         b) Worksite, Interior; 3rd Flr, Central Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 35 inches; on, or about, 03/20/2014.       c) Worksite, Interior; 3rd Flr, North Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 36 inches; on, or about, 03/20/2014.       d) Worksite, Interior; 2rd Flr, Southern Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 32 inches; on, or about, 03/20/2014.       e) Worksite, Interior; 2rd Flr, Central Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 31 inches; on, or about, 03/20/2014.       f) Worksite, Interior; 2rd Flr, North Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 35 inches; on, or about, 03/20/2014.          Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.502 B06

Other-than-serious 2 instances 20 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00
29 CFR 1926.502(b)(6): Guardrail systems were not surfaced so as to prevent injury to an employee from punctures or lacerations, and to prevent snagging of clothing.    a) Worksite, Interior; 3rd Flr, Atrium - Wire rope was used for top and mid-rails. The dead end of wire rope was not secured and extended into areas where employees walk and work; on, or about, 03/20/2014.      b) Worksite, Interior; 2rd Flr, Atrium - Wire rope was used for top and mid-rails. The dead end of wire rope was not secured and extended into areas where employees walk and work; on, or about, 03/20/2014.         Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $1200
  • — Z (S) $1200

1926.502 B09

Other-than-serious 1 instance 20 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.502(b)(9): The employer failed to ensure that wire rope used as a top rail was flagged at 6-foot intervals with high-visibility material.    a) Worksite, Interior; 3rd Flr, Atrium Openings - Wire rope was used for top and mid-rails without being flagged; on, or about, 03/20/2014.      b) Worksite, Interior; 2rd Flr, Atrium Openings - Wire rope was used for top and mid-rails without being flagged; on, or about, 03/20/2014.           Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $2000
  • — Z (S) $2000

1926.416 B02

Other-than-serious 2 instances 20 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.416(b)(2): Working spaces, walkways, and similar locations were not kept clear of cords which created a hazard to employees:    a) Worksite, Interior, 3rd Flr - Extension cords laid throughout atrium work areas presented tripping hazards; on, or about, 02/20/2014.     b) Worksite, Interior, 2rd Flr - Extension cords laid throughout atrium work areas presented tripping hazards; on, or about, 02/20/2014.           Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $2800
  • — Z (S) $2800

1926.1052 C04

Other-than-serious 3 instances 20 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.1052(c)(4): Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members were not provided between the top rail of the stairrail system and the stairway steps:    a) Worksite, Interior, Stair A - Stair-rail system was constructed without mid-rails; on, or about; 03/19/22014.      b) Worksite, Interior, Stair B - Stair-rail system was constructed without mid-rails; on, or about; 03/19/22014.      c) Worksite, Interior, Stair C - Stair-rail system was constructed without mid-rails; on, or about; 03/19/22014.           Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (2)
  • — I (O) $2000
  • — Z (S) $2000

View DONALDSON INTERIORS, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339642019.