ATLANTA, GA —
OSHA Inspection: PREMIER FLOORING, INC.
Unprogrammed Related inspection · Health discipline
At a glance
On , OSHA opened an unprogrammed Related health inspection of PREMIER FLOORING, INC. in 1491 DRUID VALLEY DRIVE NE, ATLANTA, GA 30329 (NAICS 238330). OSHA activity number 339945115.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PREMIER FLOORING, INC.
- Site address
- 1491 DRUID VALLEY DRIVE NE
- City
- ATLANTA
- State
- GA
- ZIP
- 30329
- Mailing
- 5884 PEACHTREE ROAD, ATLANTA, GA 30341
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238330
- Employees
- 5
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.1101 K03 I
- Issued
- Sep 30, 2014
- Abate by
- Nov 3, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(k)(3)(i): Before the employer permitted its own employees to perform work subject to this standard in areas containing asbestos-containing material (ACM) and presumed asbestos-containing material (PACM), the employer did not identify the presence, location and quantity of asbestos containing material and/or presumed asbestos containing material therein pursuant to 29 CFR 1926.1101(k)(1): Premier Flooring, Inc. - on or about August 27, 2014, at Ashford Druid Hills Apartments, prior to beginning work involving the removal or disturbance of asbestos containing materials (ACM) or presumed asbestos containing materials (PACM), the employer did not identify the presence, locations, and quantity of ACM/PACM. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (O) $0
More inspections in this industry (NAICS 238330)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339945115.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.