On , OSHA opened a planned safety inspection of HOMESOURCE GENERAL CONTRACTING in 5315 AVERY ROAD, DUBLIN, OH 43016 (NAICS 238170). OSHA activity number 340014448.
Where did this inspection happen?
- Establishment
- HOMESOURCE GENERAL CONTRACTING
- Site address
- 5315 AVERY ROAD
- City
- DUBLIN
- State
- OH
- ZIP
- 43016
- Mailing
- 18 BEND VIEW DRIVE, PATASKALA, OH 43062
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238170
- Employees
- 5
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.102 A01
- Issued
- Abate by
- Penalty
- Initial $1020.00 · Current $510.00 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Employees shall be provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents. a. On the north side of building 1 where an employee was using a circular saw to cut vinyl siding, eye protection was not used, thereby exposing the employee's eyes to a struck-by hazard.
Recent events (2)
- — I (S) $510
- — Z (S) $1020
1926.451 C02
- Issued
- Abate by
- Penalty
- Initial $1360.00 · Current $680.00 Reduced
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation. a. On the east side of building 1 where employee were installing vinyl siding from a pump jack scaffold, the poles of the pump jack were placed on scrap pieces of vinyl on top of wet and muddy ground and were not placed on base plates or mud sills, thereby exposing employees to a 11 foot fall hazard.
Recent events (2)
- — I (S) $680
- — Z (S) $1360
1926.451 G04 I
- Issued
- Abate by
- Penalty
- Initial $2040.00 · Current $1020.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a. On the east side of building number 1 where employees were installing vinyl siding from an elevated pump jack scaffold, there were no guardrail systems installed, thereby exposing the employees to a 11 foot fall hazard.
Recent events (2)
- — I (S) $1020
- — Z (S) $2040
More inspections in this industry (NAICS 238170)
OXFORD, OH—2026-07-13
R&R SIDING LLC
WINSTON SALEM, NC—2026-07-10
161522 - MS SIDING LLC
SLINGER, WI—2026-07-10
DYLAN MATTHEW SHELLEY LLC
WINSTON SALEM, NC—2026-07-09
161514 - ALPHA OMEGA CONSTRUCTION GROUP, INC
ATLANTA, GA—2026-07-09
ESV CONSTRUCTION LLC
More inspections in OH
OXFORD, OH—2026-07-13
R&R SIDING LLC
CONNEAUT, OH—2026-07-13
CONTINENTAL STRUCTURAL PLASTICS
CAMDEN, OH—2026-07-13
ALBERTO MORALES
HARRISON, OH—2026-07-10
WEBER FAMILY FARMS LLC
JEFFERSON, OH—2026-07-10
LAKE CITY PLATING LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340014448.