HARWOOD HEIGHTS, IL —
OSHA Inspection: WINZELER, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WINZELER, INC. in 7355 WEST WILSON AVENUE, HARWOOD HEIGHTS, IL 60706 (NAICS 326199). OSHA activity number 340080829.
Where did this inspection happen?
- Establishment
- WINZELER, INC.
- Site address
- 7355 WEST WILSON AVENUE
- City
- HARWOOD HEIGHTS
- State
- IL
- ZIP
- 60706
- Mailing
- 7355 WEST WILSON AVENUE, HARWOOD HEIGHTS, IL 60706
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 57
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $2310.00 · Current $1617.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Facility Wide - Winzeler, Inc. dba Winzeler Gear, Inc. failed to conduct a periodic inspection of the energy control procedures at least annually. In accordance with 29CFR 1903.19(d), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1617
- — Z (S) $2310
1910.178 L04 III
- Issued
- Abate by
- Penalty
- Initial $2310.00 · Current $1617.00 Reduced
General-duty citation text
29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: a) Facility Wide - On November 13, 2014, Winzeler, Inc. dba Winzeler Gear, Inc. did not ensure that an evaluation of each forklift truck operator's performance was being conducted at least once every three years. In accordance with 29CFR 1903.19(d), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1617
- — Z (S) $2310
1910.179 B05
- Issued
- Abate by
- Penalty
- Initial $770.00 · Current $539.00 Reduced
General-duty citation text
29 CFR 1910.179(b)(5): The rated load of crane(s) was not plainly marked on each side of the crane: a) Mold Maintenance Tool Room - On November 13, 2014, Winzeler, Inc. dba Winzeler Gear, Inc. did not ensure the rated load of the overhead orange painted crane was plainly marked on the crane. In accordance with 29CFR 1903.19(d), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $539
- — Z (O) $770
1910.303 G01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: a) Production Area - On November 13, 2014, Winzeler, Inc. dba Winzeler Gear, Inc. did not ensure sufficient access and working space was provided at an electrical panel near the Engel plastic molding machine (#5). The electrical panel was blocked by boxes being stored in front of the panel. b) Production Area - On November 13, 2014, Winzeler, Inc. dba Winzeler Gear, Inc. did not ensure sufficient access and working space was provided at an electrical panel near the Engel plastic molding machine (#10). The electrical panel was blocked by boxes being stored in front of the panel. In accordance with 29CFR 1903.19(d), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at WINZELER, INC.
CHICAGO, IL—1986-02-19
WINZELER INC
View WINZELER, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 326199)
CONNEAUT, OH—2026-07-13
CONTINENTAL STRUCTURAL PLASTICS
PETALUMA, CA—2026-07-10
LABCON NORTH AMERICA
KEEWATIN, MN—2026-07-09
111565 - TACKLE TAMER PRODUCTS INC
EAST FLAT ROCK, NC—2026-07-09
161517 - ELKAMET, INC.
LANESBOROUGH, MA—2026-07-08
LANSEN MOLD CO., INC.
More inspections in IL
BLOOMINGTON, IL—2026-07-13
UNKNOWN CONTRACTOR
GRANITE CITY, IL—2026-07-13
UNITED STATES STEEL CORPORATION
DECATUR, IL—2026-07-10
TILLAMOOK ILLINOIS, LLC
NEW LENOX, IL—2026-07-10
A.D GENERAL CONSTRUCTION LLC
LOCKPORT, IL—2026-07-09
ROBERTO GOMEZ DBA ROBERTO GOMEZ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340080829.