NEWBURYPORT, MA —
OSHA Inspection: BERKSHIRE MANUFACTURED PRODUCTS, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of BERKSHIRE MANUFACTURED PRODUCTS, INC. in 116 PARKER STREET, NEWBURYPORT, MA 01950 (NAICS 332116). OSHA activity number 340700418.
Where did this inspection happen?
- Establishment
- BERKSHIRE MANUFACTURED PRODUCTS, INC.
- Site address
- 116 PARKER STREET
- City
- NEWBURYPORT
- State
- MA
- ZIP
- 01950
- Mailing
- 116 PARKER STREET, NEWBURYPORT, MA 01950
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332116
- Employees
- 150
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 C04 II
- Issued
- Abate by
- Penalty
- Initial $4500.00 · Current $4500.00
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to the items of this section: (a) Location - 116 Parker Street, Newburyport, MA: On or about 6/11/2015, energy control procedures were not adequately specific to control hazardous energy during the servicing and maintenance of machines.
Recent events (2)
- — I (S) $4500
- — Z (S) $4500
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $4500.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Location - 116 Parker Street, Newburyport, MA: On or about 6/11/2015, periodic inspection of energy control procedures were not conducted at least annually, and when conducted previously did not ensure compliance with the requirements of 29 CFR 1910.147.
Recent events (2)
- — I (S) $0
- — Z (S) $4500
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $900.00 · Current $500.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection: (a) Location - 116 Parker Street, Newburyport, MA: On or about 6/11/2015, the employer's periodic inspection of energy control procedures certification did not contain documentation identifying the machine or equipment inspected and the employees included in the inspection.
Recent events (2)
- — I (O) $500
- — Z (O) $900
More inspections in this industry (NAICS 332116)
SPRINGDALE, PA—2026-04-23
TECKLANE MANUFACTURING, INC.
STRATFORD, CT—2026-02-10
BLASE MANUFACTURING COMPANY
MINNEAPOLIS, MN—2026-01-07
110505 - RAO MANUFACTURING COMPANY
PINE CITY, MN—2025-12-02
110353 - M-M MANUFACTURING INC DBA PRODUCT FABRICATORS
RICHARDSVILLE, KY—2025-08-27
68342 - CANNON AUTOMOTIVE SOLUTIONS - BOWLING GREEN INC
More inspections in MA
WORCESTER, MA—2026-07-10
QUINSIGAMOND COMMUNITY COLLEGE
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
EVERETT, MA—2026-07-10
HORIZON RETAIL CONSTRUCTION INC
NORTON, MA—2026-07-09
DYNAMIC RESIDENTIAL ROOF MARKETING, LLC
NORTON, MA—2026-07-09
LM GENERAL CONSTRUCTION INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340700418.