OSHA Inspection: HOPEDAY CONSTRUCTION, LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of HOPEDAY CONSTRUCTION, LLC in 1545 GIRRARD ST., NE, WASHINGTON, DC 20005 (NAICS 237110). OSHA activity number 341052900.
Where did this inspection happen?
- Establishment
- HOPEDAY CONSTRUCTION, LLC
- Site address
- 1545 GIRRARD ST., NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20005
- Mailing
- 2421 PENNSYLVANIA AVE., NW, WASHINGTON, DC 20037
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 4
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.651 K02
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.651(k)(2): When the competent person found evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees were not removed from the hazardous area until the necessary precautions have been taken to ensure their safety: a) 1700 Girrard St., NE - On or about 11/04/2015, the competent person working with a crew of construction workers installing underground utilities did not remove the workers from a 7 foot deep excavation which contained a wooden trench shield having a damaged structural member In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $2800
1926.652 A01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c). a) 1700 Girrard St., NE On or about 11/04/2015, a construction worker was exposed to a crushing hazard while installing a fire hydrant and occupying a 7 foot deep excavation where a protective system had not been provided. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.652 D03
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.652(d)(3): When material or equipment that was used for protective systems is damaged, a competent person did not examine the material or equipment and evaluate its suitability for continued use; and if a competent person cannot assure the material or equipment is able to support the intended loads or is otherwise suitable for safe use, such material or equipment was not removed from service and evaluated and approved by a registered professional engineer before being returned to service. a) 1700 block of Girrard St., NE - On or about 11/04/2015, a 4 inch by 4 inch horizontal structural member, which was a part of a wooden trench shield being used in a utility installation operation, was fractured. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.652 G02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.652(g)(2): Excavations of earth material to a level no greater than 2 feet (.61m) below the bottom of a shield was permitted: a) 1700 block of Girrard St., NE - On or about 11/04/2015, a wooden trench shield was placed three feet above the bottom of the trench. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.652 C04 I
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.652(c)(4)(i): Support systems, shield systems, and other protective systems not utilizing Option 1, Option 2 or Option 3 in 29 CFR 1926.652 (c) were not approved by a registered professional engineer: a) 1700 block of Girrard St., NE - On or about 11/04/2015, there was no indication that a professional engineer had designed a wooden trench shield used to protect two construction workers installing a fire hydrant from a 7 foot deep trench. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $2800
1926.652 C04 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.652(c)(4)(iii): A copy of a trench shield's design was not made available to the Secretary upon request: a) 1700 block of Girrard St., NE - On or about 11/04/2015, no documents were provided to the Secretary's agent when requested showing that a professional engineer had designed the wooden trench shield . In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
More inspections in this industry (NAICS 237110)
CHANDLER, AZ—2026-07-16
PREMIER UNDERGROUND CONSTRUCTION LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
CHICAGO, IL—2026-07-15
SUSTAINABLE SEWER & WATER INC.
LAKE FOREST, IL—2026-07-15
GREVERS CORPORATION DBA NORTH SHORE BORING
CHEYENNE, WY—2026-07-15
AZTEC CONSTRUCTION
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341052900.