Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PRATT CONSTRUCTION & RESTORATION INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of PRATT CONSTRUCTION & RESTORATION INC. in 2 PARK AVE, NEW YORK, NY 10016 (NAICS 238140). OSHA activity number 342477064.

Watch Pratt Construction & Restoration INC. — free Get an email when a new federal OSHA severe-injury report for Pratt Construction & Restoration INC. is published. One employer, no account, unsubscribe in one click.
Site address
2 PARK AVE
City
NEW YORK
State
NY
ZIP
10016
Mailing
310 NASSAU AVE SUITE 201, BROOKLYN, NY 11222
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
44
Ownership type
A

3 citations on file for this inspection.

1926.403 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $9959.00 · Current $7000.00 Reduced
29 CFR 1926.403(b)(1): Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees:      a) Roof near new bulkhead:    On or about July 18, 2017    The exhaust fan conduit feed was damaged and partially dismantled exposing inner wires.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $9959

1926.404 F07 I

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $9959.00 · Current $7000.00 Reduced
29 CFR 1926.404(f)(7)(i): Metal cable trays, metal raceways, or metal enclosures for conductors were not grounded and such assemblies did not meet the exceptions described in subparagraphs [A] and [B]:    a) Roof near new bulkhead:    On or about July 18, 2017    The roofer was shocked after coming into contact with ungrounded electrical conductors while installing roofing termination bars.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $9959

1926.405 A01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(a)(1)(i): Metal raceways, cable armor, and other metal enclosures for conductors were not metallically joined together into a continuous electric conductor and so connected to all boxes, fittings, and cabinets as to provide effective elect  a) Roof near new bulkhead:  On or about July 18, 2017  The conduit which connected the electrical feed to the fan was not continuous while the fan was operated.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View PRATT CONSTRUCTION & RESTORATION INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342477064.