1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: RISSER GRAIN, LLC

Follow-up inspection · Safety discipline

On , OSHA opened a follow-up safety inspection of RISSER GRAIN, LLC in 1196 HOLTWOOD ROAD, HOLTWOOD, PA 17532 (NAICS 424510). OSHA activity number 344207782.

Watch Risser Grain, LLC — free Get an email when a new federal OSHA severe-injury report for Risser Grain, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
RISSER GRAIN, LLC
Site address
1196 HOLTWOOD ROAD
City
HOLTWOOD
State
PA
ZIP
17532
Mailing
1196 HOLTWOOD ROAD, HOLTWOOD, PA 17532
Inspection type
Follow-up (F)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
424510
Employees
15
Ownership type
A

10 citations on file for this inspection.

1910.303 G02 I

Serious Gravity 5 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $7293.00 · Current $3966.00 Reduced
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i):    (a)  BIN 12, NEAR ENTRY DOOR - Employees operated the breakers inside of the orange electrical cabinet on the outside of Bin 12, and the employees were exposed to the live unguarded 3 phase 240 volt electrical conductors entering and exiting the three magnetic motor starters at the bottom of the cabinet, on or about August 5, 2019.    (b)  CONTROL ROOM, MAIN CONTROL PANEL - Employees reset the motor control starters in the control panel for the bin auger and fan systems located in the control room, and the employees were exposed to the live unguarded 3 phase 240 volt electrical conductors entering and exiting the 18 magnetic motor starters located throughout the cabinet, on or about August 5, 2019.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $3966
  • — C (S) $7293
  • — Z (S) $7293

1910.305 B01 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7293.00 · Current $3966.00 Reduced
29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions:    (a)  EXTERIOR BIN 72, NEAR ENTRY DOOR - Employers used a sweep auger to empty the bin and had plugged the sweep auger into a temporarily wired plug and cord assembly.  The plug and cord assembly had been wired so the conductors passed through an opening in the bottom of the disconnect switch, and there was nothing to protect the uninsulated conductors from abrasion, on or about July 4, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $3966
  • — C (S) $7293
  • — Z (S) $7293

1910.305 G02 III

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws:  (a)  EXTERIOR BIN 72, NEAR ENTRY DOOR - Employers used a sweep auger to empty the bin and had plugged the sweep auger into a temporarily wired plug and cord assembly.  The plug and cord assembly had been wired so that there was nothing to prevent tension being applied to the conductors as they exited the disconnect, on or about July 4, 2019.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.305 B02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7293.00 · Current $3966.00 Reduced
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose:    (a)  BIN 72, NEAR ENTRY DOOR - Employees performed grain bin operations near the entry door to bin 72, and the employer had not installed a cover on the junction box for the bin unload receptacle, which thereby exposed employees to live 240 volt electrical conductors, on or about August 5, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $3966
  • — C (S) $7293
  • — Z (S) $7293

1910.272 G01 I

Repeat Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $20420.00 · Current $11186.00 Reduced
29 CFR 1910.272(g)(1)(i): The permits that were issued by the employer for the purpose of entering bins, silos or tanks in the grain handling facility did not certify that the precautions contained in this paragraph (1910.272(g)) had been implemented prior to the employees entering the bins, silos or tanks.:    (a) RISSER GRAIN LLC, GRAIN BINS - The employer did not certify that the precautions outlined by the entry permits that were used for grain bin entry had been properly implemented, prior to the employees entering the bins, on or about August 5, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.    Risser Grain LLC, was previously cited for a violation of this occupational safety and health standard 1910.272(g)(1)(i), which was contained in OSHA inspection number 1189245, citation number 1, item number 1 and was affirmed as a final order on March 17, 2017, with respect to a workplace located at 1196 Holtwood Road, Holtwood, PA 17532.
Recent events (3)
  • — F (R) $11186
  • — C (R) $20420
  • — Z (R) $20420

1910.272 G01 II

Repeat Gravity 10 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $20420.00 · Current $11186.00 Reduced
29 CFR 1910.272(g)(1)(ii): Prior to entry, all mechanical, electrical, hydraulic, and pneumatic equipment which presented a danger to employees inside grain storage structures in the grain handling facility were not disconnected, locked out and tagged, blocked-off, or otherwise prevented from operating by other equally means or methods:    (a) GRAIN BIN 12 - Employees emptied and cleaned grain bin 12, and employee(s) could not physically perform lock out tag out while installing and disconnecting the equipment because there was no physical way to secure the electrical equipment in a de-energized position, on or about June 1, 2019.    (b) GRAIN BIN 5 - Employees emptied and cleaned grain bin 5, and employee(s) could not physically perform lock out tag out while installing and disconnecting the equipment because there was no physical way to secure the electrical equipment in a de-energized position, on or about June 1, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.      Risser Grain LLC, was previously cited for a violation of this occupational safety and health standard 1910.272(g)(1)(ii), which was contained in OSHA inspection number 1189245, citation number 1, item number 2 and was affirmed as a final order on March 17, 2017, with respect to a workplace located at 1196 Holtwood Road, Holtwood, PA 17532.
Recent events (3)
  • — F (R) $11186
  • — C (R) $20420
  • — Z (R) $20420

1910.272 J01

Repeat 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $292.00 · Current $115.00 Reduced
29 CFR 1910.272(j)(1): The employer did not develop and implement a written housekeeping program that established the frequency and the method(s) determined best to reduce accumulations of fugitive grain dust on ledges, floors, equipment.    (a) RISSER GRAIN, LLC , HOLTWOOD MILL - The written housekeeping program that the employer had developed did not describe the frequency and the methods to be used to control fugitive grain dust, on or about August 5, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.      Risser Grain LLC, was previously cited for a violation of this occupational safety and health standard 1910.272(g)(1)(ii), which was contained in OSHA inspection number 1189245, citation number 2, item number 5 and was affirmed as a final order on March 17, 2017, with respect to a workplace located at 1196 Holtwood Road, Holtwood, PA 17532.
Recent events (3)
  • — F (R) $115
  • — C (R) $292
  • — Z (R) $292

1910.272 M01 I

Repeat 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $292.00 · Current $115.00 Reduced
29 CFR 1910.272(m)(1)(i): Preventive maintenance procedures in the grain handling facility were not implemented to provide regularly scheduled inspections of the mechanical and safety control equipment associated with dryers, grain stream processing equipment.    (a) RISSER GRAIN LLC, HOLTWOOD FACILITY - The employer did not implement a formal maintenance program for the employees working in, and around, the grain handling equipment, on or about August 5, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.      Risser Grain LLC, was previously cited for a violation of this occupational safety and health standard 1910.272(g)(1)(ii), which was contained in OSHA inspection number 1189245, citation number 2, item number 6 and was affirmed as a final order on March 17, 2017, with respect to a workplace located at 1196 Holtwood Road, Holtwood, PA 17532.
Recent events (3)
  • — F (R) $115
  • — C (R) $292
  • — Z (R) $292

1910.1200 G08

Other-than-serious 1 instance 40 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(g)(8):   The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical:  (a)  RISSER GRAIN HOLTWOOD FACILITY - Employees utilized chemicals including LVP Aliphatic Hydrocarbon (WD40) and motor oils, and the employer did not maintain copies of Safety Data Sheets, on or about August 5, 2019.   No abatement certification or documentation required.
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

1910.1200 H03 IV

Other-than-serious 1 instance 40 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(h)(3)(iv):  The details of the hazard communication program developed by the employer, did not include an explanation of the safety data sheet, including the order of information and how employee could obtain and use the appropriate hazard information:  (a)  FACILITY WIDE - The employer did not train employees on the hazard communication 2012 changes to the safety datasheet, including the format of the safety datasheet and how to identify pictograms, on or about August 5, 2019.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

View RISSER GRAIN, LLC's full OSHA safety record →