1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: BAZZINI LLC

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of BAZZINI LLC in 1035 MILL ROAD, ALLENTOWN, PA 18106 (NAICS 311330). OSHA activity number 344236724.

Watch Bazzini LLC — free Get an email when a new federal OSHA severe-injury report for Bazzini LLC is published. One employer, no account, unsubscribe in one click.
Establishment
BAZZINI LLC
Site address
1035 MILL ROAD
City
ALLENTOWN
State
PA
ZIP
18106
Mailing
1035 MILL ROAD, ALLENTOWN, PA 18106
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
311330
Employees
450
Ownership type
A

4 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $13260.00 · Current $13260.00
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:    a) Bazzini - On or about August 15, 2019, an employee (feeder) was assigned to clean an electric impeller pump that was located at the M1 Center Holding Kettle and the employer had not developed, documented and utilized procedures for the control of potentially hazardous energy.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $13260
  • — Z (S) $13260

1910.147 C07 I

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $13260.00 · Current $0.00 Reduced
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees:    a) Bazzini - On or about August 11, 2019, the employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by an employee who suffered a partial amputation to their finger while servicing a clogged electric impeller pump on the M1 Center Holding Kettle.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $13260

1910.147 D

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $13260.00 · Current $13740.00
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and/or was not done in sequence as required by 29 CFR 1910.147(d) (1)-(6):     a) Bazzini - On or about August 15, 2019, an employee who suffered a partial amputation to their finger while servicing a clogged electric impeller pump on the M1 Center Holding Kettle, had not performed the proper lockout tagout sequence actions (1) through (6) as specified by paragraph (d).    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $13740
  • — Z (S) $13260

1910.147 C08

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $10419.00 · Current $0.00 Reduced
29 CFR 1910.147(c)(8): Lockout or tagout was not performed only by the authorized employees who are performing the servicing or maintenance:    a) Bazzini - On or about August 15, 2019, authorized lockout tagout employees were placing their locks on the M1 Center Holding Kettle electric impeller pump, however affected employees were performing the servicing on the impeller pump .    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $10419

View BAZZINI LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344236724.