OSHA Inspection: PRATA CONSTRUCTION LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of PRATA CONSTRUCTION LLC in 361 - 367 MARSHALL ST, PATERSON, NJ 07503 (NAICS 238170). OSHA activity number 345903223.

Watch Prata Construction LLC — free Get an email when a new federal OSHA severe-injury report for Prata Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
361 - 367 MARSHALL ST
City
PATERSON
State
NJ
ZIP
07503
Mailing
3125 ROUTE 10 EAST, DENVILLE, NJ 07834
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238170
Employees
9
Ownership type
A

3 citations on file for this inspection.

1926.452 J02

Serious Gravity 10 2 instances 4 exposed
Issued
Penalty
Initial $4786.00 · Current $3111.00 Reduced
29 CFR  1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary.   a) Employees installed Tyvek on the building's façade from 2 pump jack scaffolds that were over 50 feet high which did not have triangular bracing installed at the bottom and other points as necessary, on or about 4/15/22, at or near 361-367 Marshall St., Paterson NJ.  b) Employees installed Tyvek on the building's façade from 2 pump jack scaffolds that were over 50 feet high which did not have triangular bracing installed at the bottom and other points as necessary, on or about 5/3/22, at or near 361-367 Marshall St., Paterson NJ.
Recent events (2)
  • — I (S) $3110.9
  • — Z (S) $4786

1926.502 D15

Serious Gravity 10 2 instances 4 exposed
Issued
Penalty
Initial $4786.00 · Current $3111.00 Reduced
29 CFR  1926.502(d)(15): Anchorage points used for attachment of personal fall arrest equipment were not  independent of any anchorage point being used to support or suspend platforms and capable of supporting at least 5,000 pounds (22.2 kN) per employee   a) Employees installed Tyvek on the building's façade from 2 pump jack scaffolds that were over 50 feet high and the anchorage used for the personal fall arrest system was not installed per specifications to support at least 5,000 pounds, on or about 4/15/22, at or near 361-367 Marshall St., Paterson NJ.  b) Employees installed Tyvek on the building's façade from 2 pump jack scaffolds that were over 50 feet high and the anchorage used for the personal fall arrest system was not installed per specifications to support at least 5,000 pounds, on or about 5/3/22, at or near 361-367 Marshall St., Paterson NJ.
Recent events (2)
  • — I (S) $3110.9
  • — Z (S) $4786

1926.451 F06

Willful Gravity 10 4 instances 8 exposed
Issued
Abate by
Penalty
Initial $31906.00 · Current $20739.00 Reduced
29 CFR  1926.451(f)(6):Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6).  a) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Left Side - Marshall St. Façade: employees were exposed to electric hazards while installing Tyvek from a pump jack scaffold platform that was approximately 5 feet  from a 13KV/26KV primary line, on or about 4/15/22  b) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Right Side - Marshall St. Façade: employees were exposed to electric hazards while installing Windows from a pump jack scaffold platform that was approximately 5 feet  from a 13KV/26KV/69KV  primary line, on or about 4/15/22  c) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Left Side - Marshall St. Façade: employees were exposed to electric hazards while installing siding from a pump jack scaffold platform that was approximately 5 feet  from a 13KV primary line, on or about 5/3/22.  d) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Right Side - Marshall St. Façade: employees were exposed to electric hazards while installing siding from a pump jack scaffold platform that was approximately 5 feet  from a 13KV primary line, on or about 5/3/22.
Recent events (2)
  • — I (W) $20738.9
  • — Z (W) $31906

View PRATA CONSTRUCTION LLC's full OSHA safety record →