OSHA Inspection: ULTRA-POLY CORPORATION

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of ULTRA-POLY CORPORATION in 710 WARNER STREET BLDG. 1, SCRANTON, PA 18505 (NAICS 326140). OSHA activity number 346639156.

Watch Ultra-Poly Corporation — free Get an email when a new federal OSHA severe-injury report for Ultra-Poly Corporation is published. One employer, no account, unsubscribe in one click.
Site address
710 WARNER STREET BLDG. 1
City
SCRANTON
State
PA
ZIP
18505
Mailing
102 DEMI ROAD, PORTLAND, PA 18351
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326140
Employees
13
Ownership type
A

8 citations on file for this inspection.

1910.28 B01 I

Serious Gravity 5 1 instance 13 exposed
Issued
Abate by
Penalty
Initial $12055.00 · Current $9600.00 Reduced
29 CFR  1910.28(b)(1)(i):  Except as provided elsewhere in this section 29 CFR 1910.28, the employer did not ensure that each employee on a walking-working surface with an unprotected side or edge that is 4 feet (1.2 m) or more above a lower level is protected from falling by one or more of the systems described in 29 CFR 1910.28(b)(1)(i):  a) Zeno Machine Conveyor: Employees are exposed to fall hazards in excess of 10 feet when unjamming the Zeno Shredder due to standing on the top of the conveyor system without any fall protection system, on or about April 12, 2023.  Abatement certification required.
Recent events (2)
  • — I (S) $9600
  • — Z (S) $12055

1910.146 C01

Serious Gravity 10 1 instance 13 exposed
Issued
Abate by
Penalty
Initial $14063.00 · Current $11200.00 Reduced
29 CFR  1910.146(c)(1): The employer did not evaluate the workplace to determine if any spaces were permit-required confined spaces:  a) Zeno Machine Hopper: The employer did not evaluate the workplace to determine if employees entering the shredder area of the Zeno Shredder was entering a permit required confined space, on or about April 17, 2023.  Abatement certification and documentation required.
Recent events (2)
  • — I (S) $11200
  • — Z (S) $14063

1910.146 D02

Serious Gravity 10 1 instance 13 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.146(d)(2): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not identify and evaluate the hazards of permit spaces before employees entered:  a) Zeno Shredder: The employer did not identify and evaluate the hazards of a permit required confined space prior to employees entering the space, on or about April 17, 2023.   Abatement certification and documentation required.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 G01

Serious Gravity 10 1 instance 13 exposed
Issued
Abate by
Penalty
Initial $14063.00 · Current $0.00 Reduced
29 CFR  1910.146(g)(1): The employer did not provide training so that all employees whose work was regulated by 29 CFR 1910.146 (permit required confined spaces) acquired the understanding, knowledge, and skills necessary for the safe performance of the duties assigned under 29 CFR 1910.146:  a) 701 Warner Street, Bldg 1, Scranton, PA 18505: Employees entering the shredder were not trained with the understanding, knowledge and skills to do so safely, exposing them to crushing hazards, on or about April 17, 2023  Abatement certification and documentation required.
Recent events (2)
  • — I (S) $0
  • — Z (S) $14063

1910.243 B02

Serious Gravity 1 2 instances 13 exposed
Issued
Abate by
Penalty
Initial $6026.00 · Current $4800.00 Reduced
29 CFR  1910.243(b)(2): Airhose and hose connections used for conducting compressed air to utilization equipment was not designed for the pressure and service to which they were subjected:  a) Zeno Shredder Line Rear: Employees were exposed to struck-by hazards due to  hose clamps, which were not rated or designed for the pressure and service to which they were subjected, being utilized to connect hoses and ends, on or about  April 17, 2023.  b) Zeno Shredder Line Operators Panel: Employees were exposed to struck-by hazards due to  hose clamps, which were not rated or designed for the pressure and service to which they were subjected, being utilized to connect hoses and ends, on or about  April 17, 2023.  Abatement certification required.
Recent events (2)
  • — I (S) $4800
  • — Z (S) $6026

1910.303 B02

Serious Gravity 1 2 instances 13 exposed
Issued
Abate by
Penalty
Initial $6026.00 · Current $4800.00 Reduced
29 CFR  1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  a)  Zeno Machine CCTV System: Employees were exposed to shock and fire hazards because an extension cord was used to power a relocatable power tap, on or about April 17, 2023.  Abatement certification required.
Recent events (2)
  • — I (S) $4800
  • — Z (S) $6026

1910.305 G01 IV D

Serious Gravity 1 2 instances 13 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces:  a) : Zeno Machine CCTV System: Employees were exposed to shock and fire hazards due to flexible cords being attached to the building to power a CCTV system, on or about April 17, 2023.  b) Zeno Machine overhead light: Employees were exposed to shock and fire hazards due to flexible cords being attached to the building to power an overhead light, on or about April 17, 2023.  Abatement certification required.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G01 IV A

Repeat Gravity 1 2 instances 13 exposed
Issued
Abate by
Penalty
Initial $12053.00 · Current $9600.00 Reduced
29 CFR  1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  a) Zeno Machine CCTV System: Employees were exposed to shock and fire hazards due to flexible cords being used to power a CCTV camera system for over one year, on or about April 17, 2023.  b) Zeno Machine overhead light: Employees were exposed to shock and fire hazards due to flexible cords being used to power an overhead light for over one year, on or about April 17, 2023.  Abatement certification and documentation required.  Ultra-Poly Corporation was previously cited for a violation of this occupational safety and health standard 29 CFR 1910.305(g)(1)(iv)(A), which was contained in OSHA inspection number 133043, citation number 2, item number 2a and was affirmed as a final order on December 6, 2018, with respect to a workplace located at BIDA Complex #350 3rd & Oak Street BERWICK, PA 18603.
Recent events (2)
  • — I (R) $9600
  • — Z (R) $12053

View ULTRA-POLY CORPORATION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346639156.