Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: FRAME RITE CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FRAME RITE CONSTRUCTION in 606 COCA AVENUE, HERSHEY, PA 17033 (NAICS 238130). OSHA activity number 347406118.

Watch Frame Rite Construction — free Get an email when a new federal OSHA severe-injury report for Frame Rite Construction is published. One employer, no account, unsubscribe in one click.
Site address
606 COCA AVENUE
City
HERSHEY
State
PA
ZIP
17033
Mailing
1989 BLACK WOODS ROAD, PORT TREVORTON, PA 17864
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
10
Ownership type
A

1 citation on file for this inspection.

1926.501 B13

Serious Gravity 10 2 instances 2 exposed
Issued
Jul 25, 2024
Abate by
Aug 20, 2024
Penalty
Initial $4,839 · Current $3,000 Reduced
29 CFR  1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   (a) 606 Coca Avenue, Hershey PA, Roof,  Fall to Exterior - Employees performed residential roofing activities on a two-story multi pitched residential roof,  approximately 18 feet above grade with an 10:12 and 6:12 roof pitch, without utilizing any means of fall protection, on or about April 11, 2024.  (b) 606 Coca Avenue, Hershey PA, Roof,  Fall to Interior - Employees performed residential roofing activities on a two-story residential roof,  approximately 8 feet above grade with an 10:12 roof pitch, without utilizing any means of fall protection, on or about April 11, 2024.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $4839

View Frame Rite Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347406118.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.