1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: FLOW-LINE CONSTRUCTION, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of FLOW-LINE CONSTRUCTION, INC. in INTERSECTION OF COLLEGE AND MORRISS ROAD SOUTH OF MARCUS HIGH SCHOOL, FLOWER MOUND, TX 75028 (NAICS 237110). OSHA activity number 348241415.

Watch Flow-Line Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Flow-Line Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
INTERSECTION OF COLLEGE AND MORRISS ROAD SOUTH OF MARCUS HIGH SCHOOL
City
FLOWER MOUND
State
TX
ZIP
75028
Mailing
PO BOX 600881, DALLAS, TX 75360
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
8
Ownership type
A

5 citations on file for this inspection.

1926.651 B04

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $9268.00 · Current $0.00 Reduced
29 CFR  1926.651(b)(4):While the excavation was opened, underground installations were not protected, supported or removed as necessary to safeguard employees:  On or about May 12, 2025, and at times prior thereto, underground utility lines were not supported, protected, and/or removed while employees performed utility work.
Recent events (2)
  • — I (S) $0
  • — Z (S) $9268

1926.651 C02

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $9268.00 · Current $6488.00 Reduced
29 CFR  1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees:  On or about May 12, 2025, and at times prior thereto, a safe means of egress was not provided to employees while performing utility work.
Recent events (2)
  • — I (S) $6487.6
  • — Z (S) $9268

1926.651 H01

Serious Gravity 10 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $9268.00 · Current $6488.00 Reduced
29 CFR  1926.651(h)(1):Employees were working in excavations in which there was accumulated water, or excavations in which water was accumulating, and adequate precautions had not been taken to protect employees against the hazards posed by water accumulation.  On or about May 1, 2025, at times prior thereto and thereafter, employees within a trench were not protected from water accumulation while performing utility work in the following instances (a-b):  a) On or about May 1, 2025, employees within a trench were not protected from water accumulation while performing utility work. b) On or about May 12, 2025, employees within a trench were not protected from water accumulation while performing utility work.
Recent events (2)
  • — I (S) $6487.6
  • — Z (S) $9268

1926.651 I03

Other-than-serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4502.00 · Current $3151.00 Reduced
29 CFR  1926.651(i)(3):Sidewalks, pavements, or appurtenant structures had been undermined and a support system or another method was not provided to protect employees from the possible collapse of such structures:  On or about May 12, 2025, and at times prior thereto, employees worked in a trench where the roadway was undermined without a support system in place to prevent collapse.
Recent events (2)
  • — I (O) $3151.4
  • — Z (S) $4502

1926.652 A01

Serious Gravity 10 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $9268.00 · Current $6488.00 Reduced
29 CFR  1926.652(a)(1):Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c).  On or about May 12, 2025, and at times prior thereto, employee(s) performed utility work within a trench without an adequate protective system in the following instances (a-b):  a) On or about May 1, 2025,  employee(s) performed utility work within a trench without an adequate protective system. b) On or about May 12, 2025, employee(s) performed utility work within a trench without an adequate protective system.
Recent events (2)
  • — I (S) $6487.6
  • — Z (S) $9268

View FLOW-LINE CONSTRUCTION, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348241415.