942,588Inspections Most recent open 2026-07-09 Last loaded 2026-07-13
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: CASTLE CONSTRUCTION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of CASTLE CONSTRUCTION in 667 - 39TH AVE 667 39TH AVE, SAN FRANCISCO, CA 94121 (NAICS 236118). OSHA activity number 348581877.

Establishment
CASTLE CONSTRUCTION
Site address
667 - 39TH AVE 667 39TH AVE
City
SAN FRANCISCO
State
CA
ZIP
94121
Mailing
253 PARIS ST, SAN FRANCISCO, CA 94112
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
5
Ownership type
A

11 citations on file for this inspection.

1509(A)

Other-than-serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $375.00
Recent events (3)
  • — O (O) $375
  • — C (O) $375
  • — Z (O) $375

1509(B)

Other-than-serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $375.00
Recent events (3)
  • — O (O) $375
  • — C (O) $375
  • — Z (O) $375

1512(B)

Other-than-serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $375.00
Recent events (3)
  • — O (O) $375
  • — C (O) $375
  • — Z (O) $375

1512(I)

Other-than-serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $375.00
Recent events (3)
  • — O (O) $375
  • — C (O) $375
  • — Z (O) $375

3395(I)

Other-than-serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $375.00
Recent events (3)
  • — O (O) $375
  • — C (O) $375
  • — Z (O) $375

1514(A)

Serious Gravity 10 1 instance 4 exposed
Issued
Penalty
Initial $4500.00 · Current $4500.00
Recent events (3)
  • — O (S) $4500
  • — C (S) $4500
  • — Z (S) $4500

1529(E)

Serious Gravity 10 1 instance 4 exposed
Issued
Penalty
Initial $4500.00 · Current $4500.00
Recent events (3)
  • — O (S) $4500
  • — C (S) $4500
  • — Z (S) $4500

1529(F)(2)(A)

Serious Gravity 10 1 instance 4 exposed
Issued
Penalty
Initial $4500.00 · Current $4500.00
Recent events (3)
  • — O (S) $4500
  • — C (S) $4500
  • — Z (S) $4500

1529(G)(1)

Serious Gravity 10 1 instance 4 exposed
Issued
Penalty
Initial $4500.00 · Current $4500.00
Recent events (3)
  • — O (S) $4500
  • — C (S) $4500
  • — Z (S) $4500

1529(G)(8)(C)

Serious Gravity 10 1 instance 4 exposed
Issued
Penalty
Initial $4500.00 · Current $4500.00
Recent events (3)
  • — O (S) $4500
  • — C (S) $4500
  • — Z (S) $4500

1529(H)(2)(A)

Serious Gravity 10 1 instance 4 exposed
Issued
Penalty
Initial $4500.00 · Current $4500.00
Recent events (3)
  • — O (S) $4500
  • — C (S) $4500
  • — Z (S) $4500

View CASTLE CONSTRUCTION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348581877.