OSHA Inspection: JOLLEY ROOFING AND CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOLLEY ROOFING AND CONSTRUCTION LLC in 394 SENECA ST., OIL CITY, PA 16301 (NAICS 238160). OSHA activity number 348756065.

Site address
394 SENECA ST.
City
OIL CITY
State
PA
ZIP
16301
Mailing
PO BOX 143, UTICA, PA 16362
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
6
Ownership type
A

4 citations on file for this inspection.

1926.501 B10

Serious Gravity 5 6 instances 6 exposed
Issued
Penalty
Initial $3618.00 · Current $2800.00 Reduced
29 CFR  1926.501(b)(10):Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.  Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system.  a.) Jolley Roofing and Construction LLC, 394 Seneca St. Oil City, PA 16301,Commercial Roof- on or about 02/19/2026 and times prior thereto: Employees were installing shingles on Pathways Adolescent Center building without any protection from fall hazards. Employees were observed working within feet of the edge of the roof and were exposed to fall hazards of approximately 16 feet to ground level.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2800
  • — Z (S) $3618

1926.28 A

Serious Gravity 5 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $2837.00 · Current $1000.00 Reduced
29 CFR  1926.28(a):The employer did not require the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions.  a.) Jolley Roofing and Construction LLC, 394 Seneca St. Oil City, PA 16301,Commercial Roof- on or about 02/19/2026 and times prior thereto: employees were observed using a pneumatic driven nailer/stapler during roofing operations without eye protection.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2837

1926.1053 B01

Serious Gravity 5 1 instance 6 exposed
Issued
Penalty
Initial $2412.00 · Current $1000.00 Reduced
29 CFR  1926.1053(b)(1):Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:  a.) Jolley Roofing and Construction LLC, 394 Seneca St. Oil City, PA 16301, Commercial Roof- on or about 02/19/2026 and times prior thereto: The blue extension ladder that was used by employees to access the roof was extended approximately 1 foot above the upper landing surface at approximately 16-feet above ground level.  NO ABATEMENT CERTIFICATION OR DOCUMENATION REQUIRED
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2412

1926.20 B01

Other-than-serious 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.20(b)(1): The employer did not initiate and maintain accident prevention programs as necessary to comply with this part:  a.) Jolley Roofing and Construction LLC, 394 Seneca St. Oil City, PA 16301,Commercial Roof- on or about 02/19/2026 and times prior thereto: The employer did not have a safety and health program.  The company was engaged in construction work which involved the installation of a roof.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0