OSHA Inspection: BEXAR CONCRETE WORKS INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BEXAR CONCRETE WORKS INC. in 5031 JUDSON RD, SAN ANTONIO, TX 78270 (NAICS 327390). OSHA activity number 312846918.

Watch Bexar Concrete Works INC. — free Get an email when a new federal OSHA severe-injury report for Bexar Concrete Works INC. is published. One employer, no account, unsubscribe in one click.
Site address
5031 JUDSON RD
City
SAN ANTONIO
State
TX
ZIP
78270
Mailing
P.O. BOX 700250, SAN ANTONIO, TX 78270
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327390
SIC code (legacy)
3272
Employees
180
Ownership type
A
Industry flags
Manufacturing safety.

11 citations on file for this inspection.

1910.23 C01

Serious Gravity 01 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $495.00 Reduced
Recent events (2)
  • — I (S) $495.00
  • — Z (S) $825.00

1910.101 B

Serious Gravity 01 2 instances 3 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $495.00 Reduced
Recent events (2)
  • — I (S) $495.00
  • — Z (S) $825.00

1910.106 D07 I

Serious Gravity 01 2 instances 6 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $495.00 Reduced
Recent events (2)
  • — I (S) $495.00
  • — Z (S) $825.00

1910.147 C01

Serious Gravity 05 5 instances 6 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1155.00 Reduced
Recent events (2)
  • — I (S) $1155.00
  • — Z (S) $1925.00

1910.179 J02 III

Serious Gravity 01 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $495.00 Reduced
Recent events (2)
  • — I (S) $495.00
  • — Z (S) $825.00

1910.179 J02 IV

Serious Gravity 01 2 instances 2 exposed
Issued
Abate by

1910.212 A03 II

Serious Gravity 05 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1155.00 Reduced
Recent events (2)
  • — I (S) $1155.00
  • — Z (S) $1925.00

1910.215 A01

Serious Gravity 02 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1100.00 · Current $660.00 Reduced
Recent events (2)
  • — I (S) $660.00
  • — Z (S) $1100.00

1910.219 E01 I

Serious Gravity 05 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1155.00 Reduced
Recent events (2)
  • — I (S) $1155.00
  • — Z (S) $1925.00

1910.219 F03

Serious Gravity 05 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1155.00 Reduced
Recent events (2)
  • — I (S) $1155.00
  • — Z (S) $1925.00

1910.242 B

Serious Gravity 01 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $495.00 Reduced
Recent events (2)
  • — I (S) $495.00
  • — Z (S) $825.00

View BEXAR CONCRETE WORKS INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312846918.