SCHILLER PARK, IL —
OSHA Inspection: CHICAGO POWDERED METAL PRODUCTS CO.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CHICAGO POWDERED METAL PRODUCTS CO. in 9700 WAVELAND AVENUE, SCHILLER PARK, IL 60176 (NAICS 332117). OSHA activity number 339201394.
Where did this inspection happen?
- Establishment
- CHICAGO POWDERED METAL PRODUCTS CO.
- Site address
- 9700 WAVELAND AVENUE
- City
- SCHILLER PARK
- State
- IL
- ZIP
- 60176
- Mailing
- 9700 WAVELAND AVENUE, SCHILLER PARK, IL 60176
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
- Migrant workforce
- X
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332117
- Employees
- 95
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.147 C06 I
- Issued
- Penalty
- Initial $2975.00 · Current $1488.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedures and the requirements of this standard are being followed: a) The employer did not conduct periodic inspections of their energy control procedures to ensure that the procedures and the requirements of their energy control program were being followed by employees.
Recent events (3)
- — F (S) $1487.5
- — C (S) $2975
- — Z (S) $2975
1910.217 C02 I A
- Issued
- Abate by
- Penalty
- Initial $2975.00 · Current $1488.00 Reduced
General-duty citation text
29 CFR 1910.217(c)(2)(i)(a): Point of operation on mechanical power press did not prevent entry of hands or fingers into the point of operation by reaching through, over, under or around the guard: a) Punch Press Department - The point of operation on the Cincinnati mechanical power press model #600-R-3, serial #40176, was not completely guarded. The guard was damaged and had openings.
Recent events (3)
- — F (S) $1487.5
- — C (S) $2975
- — Z (S) $2975
1910.217 E01 I
- Issued
- Abate by
- Penalty
- Initial $2975.00 · Current $1488.00 Reduced
General-duty citation text
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment: a) The employer did not establish a program of periodic and regular inspections of their mechanical power presses.
Recent events (3)
- — F (S) $1487.5
- — C (S) $2975
- — Z (S) $2975
1910.110 E04 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.110(e)(4)(iii): LP gas container(s) installed on internal combustion engine vehicles were not securely mounted to prevent jarring loose, slipping or rotating: a) The employer had a damaged bracket of the liquified petroleum gas (LPG) tank on the Clark model #C 306, powered industrial truck.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1910.157 C01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.157(c)(1): The employer had portable fire extinguishers that were not mounted, located, identified and readily accessible to employees without subjecting the employees to possible injury: Shipping Area - A fire extinguisher was blocked by a stack of trays.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1910.305 B01 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in cabinets, boxes, and fittings shall be effectively closed. a) Warehouse Area - Four outlet receptacle had a knockout missing.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at CHICAGO POWDERED METAL PRODUCTS CO.
SCHILLER PARK, IL—2016-08-22 00:00:00
CHICAGO POWDERED METAL PRODUCTS CO.
SCHILLER PARK, IL—2016-04-12 00:00:00
CHICAGO POWDERED METAL PRODUCTS CO.
SCHILLER PARK, IL—2016-02-29 00:00:00
CHICAGO POWDERED METAL PRODUCTS CO.
SCHILLER PARK, IL—2015-03-17 00:00:00
CHICAGO POWDERED METAL PRODUCTS CO.
SCHILLER PARK, IL—2013-08-27 00:00:00
CHICAGO POWDERED METAL PRODUCTS CO.
View CHICAGO POWDERED METAL PRODUCTS CO.'s full OSHA safety record →
More inspections in this industry (NAICS 332117)
KERSEY, PA—2026-06-02
ELCO SINTERED ALLOYS CO., INC.
KERSEY, PA—2026-06-02
ELCO SINTERED ALLOYS CO., INC.
KERSEY, PA—2026-06-02
ELCO SINTERED ALLOYS CO., INC.
SAN ANTONIO, TX—2026-05-28
INDO-MIM INC.
MC DONALD, TN—2026-05-14
AMAERO ADVANCED MATERIALS & MANUFACTURING, INC.
More inspections in IL
BLOOMINGTON, IL—2026-07-13
UNKNOWN CONTRACTOR
GRANITE CITY, IL—2026-07-13
UNITED STATES STEEL CORPORATION
DECATUR, IL—2026-07-10
TILLAMOOK ILLINOIS, LLC
NEW LENOX, IL—2026-07-10
A.D GENERAL CONSTRUCTION LLC
LOCKPORT, IL—2026-07-09
ROBERTO GOMEZ DBA ROBERTO GOMEZ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339201394.