MIFFLINTOWN, PA —
OSHA Inspection: TREEN BOX AND PALLET CORPORATION
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of TREEN BOX AND PALLET CORPORATION in 400 CENTER ROAD, MIFFLINTOWN, PA 17059 (NAICS 321920). OSHA activity number 341138287.
Where did this inspection happen?
- Establishment
- TREEN BOX AND PALLET CORPORATION
- Site address
- 400 CENTER ROAD
- City
- MIFFLINTOWN
- State
- PA
- ZIP
- 17059
- Mailing
- 400 CENTER ROAD, MIFFLINTOWN, PA 17059
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321920
- Employees
- 55
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.147 A02 II B
- Issued
- Abate by
- Penalty
- Initial $4410.00 · Current $3300.00 Reduced
General-duty citation text
29 CFR 1910.147(a)(2)(ii)(B): Where an employee was required to place any part of his or her body into an area on a machine or piece of equipment where work was actually performed upon the material being processed (point of operation) or where an associated danger zone existed during a machine operating cycle, lockout tag out was not performed: (a) KM16 SAW ROOM - On or before December 21, 2015 employees operated the KM16 5(five) head saw, and while operating the saw, lumber would become jammed in between the saws. Employees climbed over the front of the saw chassis or walked behind the saw chassis, and cleared the jam by using a board to dislodge the wood that had jammed the saw. While unjamming the saw, the employees were in between or close to the saw blades, and the saw were not been de-energized and locked and tagged out of service, thereby exposing the employees to amputation injuries. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3300
- — Z (S) $4410
1910.213 F01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.213(f)(1): Feed rolls and saws on self-feed circular saw(s) were not protected by a hood or guard to prevent the hands of the operator from coming in contact with the in-running rolls or saws: (a) KM16 SAW ROOM - On or before December 21, 2015, employees operate the KM16 5(five) head saw, and while operating the saw, lumber would become jammed in between the saws. Employees climbed over the front of the saw chassis or walked behind the saw chassis, and cleared the jam by using a board to dislodge the wood that had jammed the saw. While unjamming the saw, the employees are in between or close to the saw blades, and the hood installed on each saw did not fully guard the saw blade. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $2311.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: (a) FACILITY WIDE - Employees performed servicing and maintenance activities on a variety of machinery for which lock out tagout procedures had been developed, and the employer did not conduct a periodic inspection of the control procedures, thereby exposing employees to possible injuries, on or about December 21, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $2311
1910.213 B06
- Issued
- Abate by
- Penalty
- Initial $3080.00 · Current $2200.00 Reduced
General-duty citation text
29 CFR 1910.213(b)(6): Operating treadle(s) on woodworking machine(s) were not protected against unexpected or accidental tripping: (a) KM16 SAW ROOM, LOWER PRODUCTION SHOP - Employees operated the KM16 saw, and the two foot treadles that control the in-feed area that moves the lumber through the saw were not equipped with guards over the pedals to prevent unexpected or accidental tripping, thereby exposing employees to possible injuries, on or about December 21, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2200
- — Z (S) $3080
1910.219 F03
- Issued
- Abate by
- Penalty
- Initial $3080.00 · Current $2200.00 Reduced
General-duty citation text
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven (7) feet or less above floors or platforms were not enclosed: (a) KM16 SAW ROOM, LOWER PRODUCTION SHOP - Employees working in the lower production shop used the passageway underneath the Unscrambler table to travel to and from the front and rear side of the KM16 Saw/Band Saw machines. The chain and sprocket drive of the Unscrambler table did not contain a guard on the rear/underside of the drive chain and pulley, which thereby exposed those employees to caught in hazards, on or about December 21, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2200
- — Z (S) $3080
More inspections at TREEN BOX AND PALLET CORPORATION
MIFFLINTOWN, PA—2015-12-21 00:00:00
TREEN BOX AND PALLET CORPORATION
View TREEN BOX AND PALLET CORPORATION's full OSHA safety record →
More inspections in this industry (NAICS 321920)
LAKELAND, FL—2026-07-16
ELIJAH WHOLESALE, LLC.
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
CLANTON, AL—2026-07-14
SPECWOOD PRODUCTS, INC.
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
WASHINGTON COURT HOUSE, OH—2026-07-09
HALLIDAY LUMBER, LLC
More inspections in PA
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
JEFFERSON HILLS, PA—2026-07-16
MARATHON PETROLEUM COMPANY ASPHALT TERMINAL
SMITHFIELD, PA—2026-07-16
CARLISLE CONSTRUCTION MATERIALS
PITTSBURGH, PA—2026-07-15
DREAM GREENER LAWN & LANDSCAPE
COCHRANTON, PA—2026-07-15
CRAWFORD COUNTY HARDWOODS, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341138287.