1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: DOHERTY, GIANNINI, REITZ CONSTRUCTION, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of DOHERTY, GIANNINI, REITZ CONSTRUCTION, INC. in 2656 N. ELSTON AVE., CHICAGO, IL 60647 (NAICS 237110). OSHA activity number 342620192.

Watch Doherty, Giannini, Reitz Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Doherty, Giannini, Reitz Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2656 N. ELSTON AVE.
City
CHICAGO
State
IL
ZIP
60647
Mailing
304 YORK ROAD, BENSENVILLE, IL 60106
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
4
Ownership type
A

2 citations on file for this inspection.

1910.134 E01

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4268.00 · Current $4268.00

Hazardous substances 9010

29 CFR 1926.103: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.134 of this chapter.  29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace:  (a) On September 6, 2017, Doherty, Giannini, Reitz Construction Inc. did not provide a medical evaluation to employee(s) before 3M 5000 series half-mask, negative pressure respirators were allowed to be worn voluntarily in the workplace.
Recent events (1)
  • — Z (S) $4268

1910.1200 G08

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 9010

29 CFR 1910.1200(g)(8): The employer did not ensure that safety data sheets were readily accessible to the employees in their work area during each work shift:  a) On September 6, 2017, Doherty, Giannini, Reitz Construction, Inc. did not ensure that copies of Safety Data Sheets were accessible to the employees at the worksite including, but not limited to: clay pipe, USG all purpose joint compound, and Logan pipe joint lubricant.
Recent events (1)
  • — Z (O) $0

View DOHERTY, GIANNINI, REITZ CONSTRUCTION, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342620192.