WILMINGTON, DE —
OSHA Inspection: WOHLSEN CONSTRUCTION COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WOHLSEN CONSTRUCTION COMPANY in 901 N MARKET STREET, WILMINGTON, DE 19801 (NAICS 236220). OSHA activity number 345870562.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WOHLSEN CONSTRUCTION COMPANY
- Site address
- 901 N MARKET STREET
- City
- WILMINGTON
- State
- DE
- ZIP
- 19801
- Mailing
- 548 STEEL WAY PO BOX 7066, LANCASTER, PA 17604
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 6
- Ownership type
- A
Citations
11 citations on file for this inspection.
1926.20 B02
- Issued
- Sep 23, 2022
- Abate by
- Oct 20, 2022
- Penalty
- Initial $11,188 · Current $0 Reduced
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s): a) 901 N. Market St., Wilmington, DE 19801: On or about and days prior to March 31, 2022, the employer failed to ensure frequent and regular inspections of the jobsite and equipment were conducted by a person competent in construction safety standards, exposing employees to hazards when they performed demolition and renovation activities.
Recent events (3)
- — F (S) $0
- — C (S) $11188
- — Z (S) $11188
1926.34 B
- Issued
- Sep 23, 2022
- Penalty
- Initial $11,188 · Current $5,000 Reduced
General-duty citation text
29 CFR 1926.34(b): Exits and access to exits were not marked by a readily visible sign: a) 901 N. Market St., Wilmington, DE 19801 (Throughout): On or about and days prior to March 31, 2022, the employer failed to provide visible and legible exit signs for egress.
Recent events (3)
- — F (O) $5000
- — C (S) $11188
- — Z (S) $11188
1926.350 A09
- Issued
- Sep 23, 2022
- Penalty
- Initial $11,188 · Current $5,000 Reduced
General-duty citation text
29 CFR 1926.350(a)(9): Compressed gas cylinders were not secured in an upright position at all times: Note: This paragraph does not apply to short periods of time while cylinders are being hoisted or carried: a) 901 N. Market St., Wilmington, DE 19801 (ground floor lobby): On or about March 31, 2022, the employer allowed a tank labeled UN1978 "Propane" found free standing in the first-floor lobby to be left unattended. The tanks were exposed to being knocked over, struck or damaged by passing or falling objects such as, but not limited to building materials handled during construction activities at the worksite.
Recent events (3)
- — F (O) $5000
- — C (S) $11188
- — Z (S) $11188
1926.350 A11
- Issued
- Sep 23, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.350(a)(11): Cylinders were not stored in definitely assigned storage places where the cylinders would not be knocked over or damaged by passing or falling objects, or subject to tampering by unauthorized persons: a) 901 N. Market St., Wilmington, DE 19801 (ground floor lobby): On or about March 31, 2022, the employer did not ensure that UN 1978 "Propane" flammable gas cylinders were stored in assigned locations to protect them from being knocked over, struck or damaged by passing or falling objects such as, but not limited to building materials handled during construction activities at the worksite.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.501 B04 III
- Issued
- Sep 23, 2022
- Penalty
- Initial $11,188 · Current $0 Reduced
General-duty citation text
29 CFR 1926.501(b)(4)(iii): Each employee on a walking/working surface was not protected from objects falling through holes (including skylights) by covers: a) 901 N. Market St., Wilmington, DE 19801 (Throughout): On or about and days prior to March 31, 2022, the employer did not make sure employees and subcontractor's employees were protected from falling objects due to uncovered holes throughout the walking/working surfaces.
Recent events (3)
- — F (S) $0
- — C (S) $11188
- — Z (S) $11188
1926.502 B02 IV
- Issued
- Sep 23, 2022
- Penalty
- Initial $7,458 · Current $5,000 Reduced
General-duty citation text
29 CFR 1926.502(b)(2)(iv): Midrails, when used, were not installed at a height midway between the top edge of the guardrail system and the walking/working level; screens and mesh, when used, did not extend from the top rail to the walking/working level and along the entire opening between top rail supports; Intermediate members, when used between posts, were more than 19 inches (.5 m) apart; Other structural members were installed such that there are no openings in the guardrail system that are more than 19 inches (48 cm) wide. a) 901 N. Market St., Wilmington, DE 19801 (2nd floor): On or about and times prior to March 31, 2022, the employer failed to install an adequate midrail guard system. Midrail systems were missing or improperly installed.
Recent events (3)
- — F (O) $5000
- — C (S) $7458
- — Z (S) $7458
1926.1052 C01 II
- Issued
- Sep 23, 2022
- Penalty
- Initial $11,188 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge: a) 901 N. Market St., Wilmington, DE 19801 (8th and 9th floor): On or about and days prior to March 31, 2022, the employer failed to install a stairrail system along the unprotected side or edge.
Recent events (3)
- — F (S) $0
- — C (S) $11188
- — Z (S) $11188
1926.150 C01 VIII
- Issued
- Sep 23, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.150(c)(1)(viii): Portable fire extinguishers were not inspected periodically in accordance with maintenance and use of portable fire extinguishers, N.F.P.A. No. 10A-1970: a) 901 N. Market St., Wilmington, DE 19801 (both stairwells on each level): On or about and days prior to March 31, 2022, the employer did not provide a properly maintained and periodically inspected fire extinguisher at the site where employees were required to use spark producing equipment upon inspection by CSHO at the site it was determined that the fire extinguishers(s) were not inspected periodically in accordance with maintenance and use of portable fire extinguishers, NFPA No. 10A-1970.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1926.403 B02
- Issued
- Sep 23, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) 901 N. Market St., Wilmington, DE 19801 (14th floor): On or about and at times prior to March 31, 2022, the employer did not ensure that all electrical equipment at the site was being used in accordance with the listed use.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1926.405 A02 II I
- Issued
- Sep 23, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(a)(2)(ii)(I): Protection was not provided to avoid damage to flexible cords and cables used for temporary wiring which passed through doorways or other pinch points. a) 901 N. Market St., Wilmington, DE 19801 (14th floor): On or about and at times prior to March 31, 2022, the employer allowed flexible cords to be extended across hallways and through doorways that were unprotected.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1926.405 G01 III B
- Issued
- Sep 23, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(g)(1)(iii)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors: a) 901 N. Market St., Wilmington, DE 19801 (Throughout): On or about and at times prior to March 31, 2022, the employer allowed flexible cords to be run through walls, ceilings, and floors exposing employees to potential electrical shock hazards.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Wohlsen Construction Company
View Wohlsen Construction Company's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in DE
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345870562.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.