1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: DIVERSIFIED CONTROL, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DIVERSIFIED CONTROL, INC. in 3333 CALIFORNIA ROAD, ORCHARD PARK, NY 14127 (NAICS 334290). OSHA activity number 347276461.

Watch Diversified Control, INC. — free Get an email when a new federal OSHA severe-injury report for Diversified Control, INC. is published. One employer, no account, unsubscribe in one click.
Site address
3333 CALIFORNIA ROAD
City
ORCHARD PARK
State
NY
ZIP
14127
Mailing
3333 CALIFORNIA ROAD, ORCHARD PARK, NY 14127
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
334290
Employees
68
Ownership type
A

2 citations on file for this inspection.

1910.147 C06 I

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4113.00 · Current $3085.00 Reduced
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  a) On or about 02/13/2024, throughout establishment, employer did not conduct periodic inspections of the Lockout/Tagout procedures for employees that perform servicing/maintenance activities such as, but not limited to: doing Preventative Maintenace of the Wash Line.  ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $3084.75
  • — Z (S) $4113

1910.147 F03 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $5485.00 · Current $4114.00 Reduced
29 CFR 1910.147(f)(3)(i): When servicing and/or maintenance is performed by a crew, craft, department or other group, they shall utilize a procedure which affords the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device.  a) On or about 02/13/2024, at the Wash Line, when employees conduct Preventative Maintenance (PM) to clean the pipes, risers, and manifolds of the Wash Line, a group lock-out procedure was not followed to ensure every employee performing PMs applied their own lock to the group lockout device.   ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $4113.75
  • — Z (S) $5485

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347276461.