ORCHARD PARK, NY —
OSHA Inspection: DIVERSIFIED CONTROL, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DIVERSIFIED CONTROL, INC. in 3333 CALIFORNIA ROAD, ORCHARD PARK, NY 14127 (NAICS 334290). OSHA activity number 347276461.
Where did this inspection happen?
- Establishment
- DIVERSIFIED CONTROL, INC.
- Site address
- 3333 CALIFORNIA ROAD
- City
- ORCHARD PARK
- State
- NY
- ZIP
- 14127
- Mailing
- 3333 CALIFORNIA ROAD, ORCHARD PARK, NY 14127
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 334290
- Employees
- 68
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $4113.00 · Current $3085.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about 02/13/2024, throughout establishment, employer did not conduct periodic inspections of the Lockout/Tagout procedures for employees that perform servicing/maintenance activities such as, but not limited to: doing Preventative Maintenace of the Wash Line. ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
- — I (S) $3084.75
- — Z (S) $4113
1910.147 F03 I
- Issued
- Abate by
- Penalty
- Initial $5485.00 · Current $4114.00 Reduced
General-duty citation text
29 CFR 1910.147(f)(3)(i): When servicing and/or maintenance is performed by a crew, craft, department or other group, they shall utilize a procedure which affords the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device. a) On or about 02/13/2024, at the Wash Line, when employees conduct Preventative Maintenance (PM) to clean the pipes, risers, and manifolds of the Wash Line, a group lock-out procedure was not followed to ensure every employee performing PMs applied their own lock to the group lockout device. ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
- — I (S) $4113.75
- — Z (S) $5485
More inspections in this industry (NAICS 334290)
NORTH CANTON, OH—2025-08-15
AWP SAFETY HEADQUARTERS
YORBA LINDA, CA—2025-05-09
WORSHIP PRODUCTIONS, LLC
HAZELWOOD, MO—2025-04-01
POTTER ELECTRIC SIGNAL COMPANY, LLC
EDGEWOOD, MD—2025-03-26
SMITHS DETECTION, INC.
DALLAS, TX—2025-03-03
TAYLOR COMMUNICATIONS
More inspections in NY
POUGHKEEPSIE, NY—2026-07-13
MARCO BOARD HOUSE, INC.
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
HEMPSTEAD, NY—2026-07-13
NYSDOCCS NASSAU AREA OFFICE
NIAGARA FALLS, NY—2026-07-10
NTVI FEDERAL INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347276461.